EasyManua.ls Logo

SunStar KM-570BL - Installation; Installation of Machine Head; Installation of Power Switch Box

SunStar KM-570BL
29 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
2
Installation
1) Installation of machine head
Insert hinge rubber into the table. As described in Figure 1, put the oil pan corner in the middle of the head
supporting rubber and attach the table. After putting the hinge in the bed hole, insert the hinge rubber and install
the sewing machine in the table corner rubber cushion.
[Figure 1]
2) Installation of power switch box
When attaching the power switch box, as shown in “Figure 2”,
attach it to lower right corner of the table.
[Figure 2]
Warning
In case of installing the machine, it should be performed by the trained engineer.
In case of wiring work, be sure to leave the work to an expert or an agent.
The machine weight over 42kg. At least 2 persons should carry out the installing work.
Plug in after finishing the installing work. In case the user press on the step by mistake, the
machine runs automatically. By doing so, it can cause the physical injuries.
Connect the earthed lines.
Imperfection of the connection of the earthed lines gives rise to an electric shock or malfunction.
Set the belt cover on top of the machine.
In case of bending the machine backward or returning to the original condition, be sure to use
both hands. If you use only one hand, it causes physical injuries by slipping.

Related product manuals