Installation
18 NT 10000...NT 12000
The following sequence must be observed during assembly:
1. Strip the voltage-free line.
2. Crimping on the circular contact with the Tyco Solarlok hand crimping
pliers.
3. Slide the cable gland onto the cable and engage the contact in the connec-
tor housing.
4. Tightening the cable gland with 1.5 Nm.
Handling The positive/negative coded connectors are marked with polarity symbols and a
coloured ring (blue = negative, red = positive. They are equipped with coding
ribs for assignment, which ensure that only connectors of the same polarity can
be connected to each other.
Connecting socket and plug:
For the system to be locked properly the locking hooks must be recessed flush
in the mating piece.
CAUTION
The connectors must not be separated under load. First interrupt the circuit at
a suitable point.
Release the locking device by pressing on the ribbing of the locking hooks and
pulling.
Connection example: