1.4.4 Connect the front and the back of the fence line to the fence plug for use.(see
Figure 1.4.4)
Figure 1.4.4
1.4.5 finish the fixture
Once you finish the fixture of the intelligent workstation and the fence line,
electrify the intelligent workstation, plug in the fence plug and test devices. If the
red light on the top of the intelligent navigation workstation is on, it means the
workstation is electrified. Plug the fence plug and the red light will be off, which
means the fence line is on work. If the red light is still on, it means the fence line is
not electrified and cannot work properly. If the red and green bi-colored light have
red light, it means it is charging; when it is green, it means it stops charging and the
fixture is successful.
16