EasyManua.ls Logo

Suzuki SV650A - Throttle Body Installation

Suzuki SV650A
187 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
146 SV650K7/SK7/AK7/SAK7 (’07-MODEL)
THROTTLE BODY INSTALLATION
1 PAIR valve hose (F) *7 Matching mark (White)
2 ISC valve hose (R) *8 Match mark to bulge of nipple.
3 ISC valve hose *9 Be careful not touch the throttle body.
4 PAIR valve hose *10 Cut after clamping.
*1 Clamp ends should face back side. *11 To cylinder head cover (F)
*2 Clamp ends should face lower side. *12 To throttle body
*3 To canister purge hose (Only for E-33)
*13
Pass through the ISC valve hose (R) upper side of
PAIR valve hose (F) and left side of PAIR valve hose.
*4 Clamp ends should face left side.
*5 Matching mark (Blue)
*14
Pass through the ISC valve hose upper side of PAIR
valve hose (F) and right side of PAIR valve hose.
*6 Matching mark (Yellow)
*3
*2
*1
*1
*6
*8
*1
*8
*7
*10
*9
*2
*4
*4
*5
25 N
.
m
2.5 kgf
-
m
18.0 lb-ft
( )
25˚
4
2
5
3
1-6
FWD
35 – 45˚
35 – 45˚
15 – 25˚
18 N
.
m
1.8 kgf
-
m
13.0 lb-ft
( )
Air cleaner side
Engine side
*1
Tighten temporarily in order to 1 to 5.
Tighten in order to 1 to 6 with torque wrench
10 N
.
m (1.0 kgf-m 7.0 lb-ft)
*11
*12
*13
*14
FWD
FWD
SAMPLE

Table of Contents

Other manuals for Suzuki SV650A

Related product manuals