EasyManua.ls Logo

Suzuki SV650A - Periodic Maintenance Schedule

Suzuki SV650A
187 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
66 SV650K7/SK7/AK7/SAK7 (’07-MODEL)
IGNITION SYSTEM
INSPECTION
IGNITION COIL PRIMARY PEAK VOLTAGE
Disconnect all the spark plug caps. (#Page 13)
Connect new spark plugs to each spark plug cap and ground
them on the cylinder.
NOTE:
Be sure that all the spark plugs are connected properly and the
battery used is in fully-charged condition.
Measure ignition coil primary peak voltage (for #1 cylinder) in
the following procedure.
Insert the needle pointed probe
A to the lead wire coupler (for
B/W wire).
%
" 09900-25009: Needle pointed probe set
Connect the multi-circuit tester with the peak voltage adaptor
as follows.
Ignition coil (for #1cylinder):
B/W wire (
+ Probe) – Ground (
- Probe)
NOTE:
Do not disconnect the ignition coil primary lead wire.
" 09900-25008: Multi-circuit tester set
%
Use the special tool, to prevent the rubber of the water
proof coupler from damage.
Before using the multi-circuit tester and peak voltage
adaptor, refer to the appropriate instruction manual.
Peak volt adaptor
Ignition coil
ECM
Battery
New spark plugs
B/WW/Bl
SAMPLE

Table of Contents

Other manuals for Suzuki SV650A

Related product manuals