EasyManua.ls Logo

Suzuki SV650A - Pre-Ride Inspection Checklist

Suzuki SV650A
187 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SV650K7/SK7/AK7/SAK7 (’07-MODEL) 49
Step 2
1) Connect the PAIR control solenoid valve coupler.
2) Turn the ignition switch ON.
3) Insert the needle pointed probes to the PAIR control solenoid
valve coupler.
4) Measure the voltage at the wire side coupler between Brown
wire and ground.
$ PAIR control solenoid valve voltage: Battery voltage
(
+ O/W –
- Ground)
" 09900-25008: Multi-circuit tester set
09900-25009: Needle pointed probe set
' Tester knob indication: Voltage (()
Is the voltage OK?
ACTIVE CONTROL INSPECTION
1) Set up the SDS tool. (Refer to the SDS operation manual for
further details.)
2) Turn the ignition switch ON.
3) Click “PAIR Sol operating control”
1.
4) Click each button
2.
At this time, if an operation sound is heard from the PAIR
control solenoid valve, the function is normal.
V
2
YES
Brown wire open or shorted to ground, or
e
connection.
If wire and connection are OK, intermittent trou-
ble or faulty ECM.
Recheck each terminal and wire harness for
open circuit and poor connection.
Replace the ECM with a known good one, and
inspect it again.
NO Open or short circuit in the O/W wire.
ECM coupler (Harness side)
SAMPLE

Table of Contents

Other manuals for Suzuki SV650A

Related product manuals