EasyManua.ls Logo

Suzuki SV650A - Page 59

Suzuki SV650A
187 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
58 SV650K7/SK7/AK7/SAK7 (’07-MODEL)
Apply thin coat of the engine oil to the new cushion seal
3,
and the O-ring
4.
%
Install the fuel injector
5 by pushing it straight to the delivery
pipe
6.
NOTE:
Align the coupler
E of injector with boss
F of the delivery pipe.
%
Install the fuel delivery pipe/hose
7 to the throttle body
assembly.
%
Tighten the fuel delivery pipe mounting screws to the speci-
fied torque.
& Fuel delivery pipe mounting screw:
5 N·m (0.5 kgf-m, 3.5 lb-ft)
Install the throttle link rod
8 and secondary throttle link rod
9.
NOTE:
The throttle link rod
8 is longer than the secondary throttle link
rod
9.
Replace the cushion seal and O-ring with the new
ones.
Never turn the injector while pushing it.
Never turn the fuel injectors while installing them.
SAMPLE

Table of Contents

Other manuals for Suzuki SV650A

Related product manuals