Auxiliary Support
Bracket
TBAA03-13 auxiliary support brackets can be fitted to the rear of the
subrack to provide additional mounting security. Figure 3.6 shows a standard
TBAA03-13 bracket
b fitted in a typical Tait cabinet c. If you are not using
the Tait cabinet, you may have to make your own brackets to suit your
installation.
Notice You must fit the auxiliary support brackets if you intend to
transport a cabinet fitted with a fully built-up base station.
We also recommend that you fit the brackets under the following
conditions:
when the installation is in an area prone to earthquakes
when third party equipment is installed hard up underneath the base
station subrack.
General Cabling We recommend that you try to route all cables to and from the base station
along the side of the cabinet so the cooling airflow is not restricted.
Figure 3.6 Auxiliary support bracket
c
b

Table of Contents

Other manuals for Tait TB9100

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Tait TB9100 and is the answer not in the manual?

Tait TB9100 Specifications

General IconGeneral
BrandTait
ModelTB9100
CategoryAccessories
LanguageEnglish

Related product manuals