EasyManua.ls Logo

Takeuchi TB210R - Page 95

Takeuchi TB210R
205 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-25
OPERATION
Digging side drains
OPERATING PROCEDURES
Use the boom swing function to dig side
ditches as shown in the figure.
Loading
AG7A040
When loading dirt onto a truck bed, load
from the back of the truck, as it is easier and
able to load more load than doing it from the
front.
Also, use a small slewing angle for greater
efficiency.
Leveling
1. Bring the hoe attachment close to the
body.
2. Gradually remove the dirt from the side of
the mound.
3. Once the mound is low, remove the dirt
from the top. If the load becomes too
heavy for the machine body, adjust by
raising or lowering the dozer blade.

Table of Contents

Other manuals for Takeuchi TB210R

Related product manuals