EasyManua.ls Logo

Takeuchi TB23R - Page 69

Takeuchi TB23R
190 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
67
OPERATION
Machine Operation
5. Travel slowly forward and backward
several times.
Warming Up in Cold Weather
1. Perform the normal warm-up procedure.
(Refer to the previous page.)
2. Set the bucket cylinder at the stroke end
and keep it there.
Do not do this for more than 30 seconds.
3. Repeat step 2 until the bucket operating
speed is normal.
Inspection After Warm-up
After warming up the engine and hydraulic
oil, perform the checks and inspections
described below, and repair if there is a
problem.
1. Check that the warning lamps and
meters are as follows:
Are all the warning lamps off?
Is the water temperature gauges
needle within the green range?
2. Check that there are no irregularities in
the exhaust color, sound and vibrations.
3. Raise the safety lock lever to engage the
lock and check that the operating and
travel levers are locked.
E4D011
D5D019
D5B009E

Table of Contents

Other manuals for Takeuchi TB23R

Related product manuals