EasyManuals Logo

Takeuchi TCR50 User Manual

Takeuchi TCR50
166 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #21 background imageLoading...
Page #21 background image
19
SAFETY
Precautions when passing
through tunnels or under bridges
Careless entry into tunnels or under bridges
can lead to serious accidents such as
contact accidents, etc. Check height and
width limits in advance and verify that the
machine is within the limits.
Operate on snow or ice with extra
care
When traveling on snow or frozen surfaces,
keep the machine travel speed down and
avoid accelerating, stopping or changing
directions abruptly.
Remember that the road shoulder, fences,
etc., may be buried in the snow and not
visible.
Precautions When Loading the
Dump Body
Do not allow loading the dump body unless
the driver and personnel are in a safe place.
Load on a firm location, do not load on a
slope. Improper loading can be the cause of
the machine tipping over or the load giving
way.
Do not exceed the maximum weight when
loading.
Do not load unevenly, load so as to
distribute the load evenly on the dump
body.
A load with poor stability should be
securely fixed to the dump body.
Operating Precautions
S2A014
S2A015

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Takeuchi TCR50 and is the answer not in the manual?

Takeuchi TCR50 Specifications

General IconGeneral
BrandTakeuchi
ModelTCR50
CategoryConstruction Equipment
LanguageEnglish