EasyManuals Logo

Takeuchi TCR50 User Manual

Takeuchi TCR50
166 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #66 background imageLoading...
Page #66 background image
64
OPERATION
Before Starting Operation
Walk-Around Inspection
Perform the walk-around inspections once a
day before starting the engine the first time
that day.
Perform the inspections as described under
“Maintenance - Walk-Around Inspection”
(pages 98 and 99).
Daily Inspection
Perform the daily inspections once a day
before starting the engine the first time that
day.
Perform the inspections as described under
“Maintenance - Daily Inspection” (pages 100
to 104).
Mounting and Dismounting
WARNING
Do not jump on or off the machine.
Never attempt to mount or dismount a
moving machine.
When mounting and dismounting the
cab, rst open the door fully to the
locked position and check that it does
not move.
Always face the access system and
maintain a three point contact with
the recommended handrails and steps
while getting on and off the machine.
Keep steps and platform clean.
Never use the safety lock lever or
control levers as hand holds.
S2D001

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Takeuchi TCR50 and is the answer not in the manual?

Takeuchi TCR50 Specifications

General IconGeneral
BrandTakeuchi
ModelTCR50
CategoryConstruction Equipment
LanguageEnglish