EasyManua.ls Logo

Taylor 220 - Priming

Taylor 220
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17
Model 220 Operating Procedures
060425
Priming
Step 1
Place the funnel in the mix inlet hole at the rear of the
hopper. Turn the funnel to the right or left so that the
opening in the funnel does not align with the opening
in the mix inlet hole.
Figure 29
Step 2
Pour 10 quarts (9.5 liters) of FRESH mix into the
hopper. This should bring the mix level up to the
second graduated mark on the rear wall of the hopper.
Step 3
With the control switch in the “OFF” position, hold an
empty mix pail beneath the ejection port. Turn the draw
rod handle and pull forward, opening the ejection port.
Figure 30
Step 4
T urn the funnel to the right or left so that the opening
in the funnel aligns with the opening in the mix inlet
hole. Mix being added will force any remaining
sanitizing solution in the freezing cylinder out into the
mix pail.
Figure 31

Other manuals for Taylor 220

Related product manuals