EasyManuals Logo

Taylor C791 User Manual

Taylor C791
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #30 background imageLoading...
Page #30 background image
6-8
OPERATING PROCEDURES
087482-M
Operating Procedures
6
10. With sanitized hands, stand the feed tubes with air
orifices in the corner of the mix hopper.
Figure 6-28
11. Repeat step 1 through step 10 for the other side of
the freezer.
Priming
Prime the machine as close as possible to the time of first
product draw.
1. With a pail beneath the door spout, lower the draw
handle. Be sure the prime plug is still in the up
position. Pour 2 gal. (7.6 L) of fresh mix into the mix
hopper and allow it to flow into the freezing cylinder.
This will force out any remaining sanitizing solution.
When full-strength mix is flowing from the door spout,
raise the draw handle.
Note: Use only fresh mix when priming the freezing
cylinder.
Figure 6-29
2. Once a steady stream of mix starts to flow from the
prime plug opening in the bottom of the freezer door,
push down the prime plug.
Figure 6-30
30228_A
30142_A
30143_A

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Taylor C791 and is the answer not in the manual?

Taylor C791 Specifications

General IconGeneral
BrandTaylor
ModelC791
CategoryFreezer
LanguageEnglish

Related product manuals