6-8
OPERATING PROCEDURES
087482-M
Operating Procedures
6
10. With sanitized hands, stand the feed tubes with air
orifices in the corner of the mix hopper.
Figure 6-28
11. Repeat step 1 through step 10 for the other side of
the freezer.
Priming
Prime the machine as close as possible to the time of first
product draw.
1. With a pail beneath the door spout, lower the draw
handle. Be sure the prime plug is still in the up
position. Pour 2 gal. (7.6 L) of fresh mix into the mix
hopper and allow it to flow into the freezing cylinder.
This will force out any remaining sanitizing solution.
When full-strength mix is flowing from the door spout,
raise the draw handle.
Note: Use only fresh mix when priming the freezing
cylinder.
Figure 6-29
2. Once a steady stream of mix starts to flow from the
prime plug opening in the bottom of the freezer door,
push down the prime plug.
Figure 6-30