EasyManua.ls Logo

TEC 100 - Table of Contents

TEC 100
35 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
Contents
Description Page
Installation Instructions
General Notes 3
Mains Wiring 3
Control Wiring 4
Other Wiring Options 5
Fitting and Wiring Temperature Sensors 6
Temperature Display Calibration 8
Commissioning Instructions
Introduction 9
Keypad Overview 9
Establishing the System Max Flow Temp 11
Setting the Programs 12
Setting the Calendar 12
Programming the On / Off Times 14
Frequency (How the Time Clock works) 16
Select Days 17
Optimise On Time 18
Optimise Off Time 19
Setting the Maximum Flow Temperature 20
Setting the Minimum Flow Temperature 21
Setting the Minimum Return Temperature 22
Setting the Mid Temperature 23
Setting the Night Temperature 24
Setting the Frost Temperature 25
Setting the External Cut-Off Temperature 26
The Plant Relay 27
Hot Water Priority 28
Internal / External Optimisation 29
Calibration 30
Rotation 32
Exiting Programming Mode 33
TEC 100/200 with Monitoring Socket
Monitor Installation and Operation 34

Related product manuals