Operation & Maintenance Manual
CD-135 / CD-155
OM-02-02
Chapter:
Issue:
Issue date:
Page:
Content:
Checklist
4
17.04.2015
4
8
Revision no.:
Revision date:
5
20.07.2016
Engine Maintenance Checklist - General
Replace high-pressure pump
(refer to Chapter 6, Annex 11 of this Manual)
If TS-1 jet fuel is being used, the high-pressure pump
MUST be replaced every 300 operating hours.
xxx
Replace excitation battery of the alternator
(refer to Chapter 6, Annex 16 of this Manual)
every
12 month
Replace alternator 14V / 28V
(refer to Chapter 6, Annex 12 of this Manual)
xxx
Replace rail pressure control valve
(refer to RM-02-02, Chapter 73-10.07)
xxx
Replace proportional pressure reducing valve
(part of the gearbox)
x
Replace clutch, if clutch assy 05-7211-K006001 or
05-7211-K006002 is installed
(refer to RM-02-02, Chapter 72-10.02)
xxxxxx
Replace friction disk,
if clutch assy 05-7211-K0094xx is installed
(refer to RM-02-02, Chapter 72-10.14)
xx
Inspect dual mass flywheel
(refer to RM-02-02, Chapter 05-20.02)
xxx
Inspection Items
Interval
(Engine operation hours)
Initials
100
200
300
600
900
1200
1500
1800
Time