EasyManua.ls Logo

TECHNOLIFT SL-9 - User Manual

Default Icon
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
IMPORTANT:
Read this manual completely before
installing or operating lift
Installation, Operation & Maintenance Manual
TWO POST LIFT
Showroom - Distribution Centre
8275, 17e Avenue, Montréal, Qc., Canada H1Z 4J9
1-800-361-4095 • 514-328-2300 • Fax 514-328-4684
AUTOMOTIVE EQUIPMENT
ECHNOLIFT
SL-9 9,000 LBS.
The specifications stated on this brochure are not binding.
We reserve the right to change the specification without notice
Question and Answer IconNeed help?

Do you have a question about the TECHNOLIFT SL-9 and is the answer not in the manual?

Summary

Product Features and Specifications

Clear-Floor Direct-Drive Model Features

Details the key features of the clear-floor, direct-drive two-post lift models.

Model SL-9 SL-9 H Specifications

Provides technical specifications for the SL-9 and SL-9H lift models.

Installation Requirements

Tools Required for Installation

Lists all necessary tools for the proper installation of the lift.

Concrete Specifications

Specifies the required concrete thickness, strength, and condition for safe installation.

Power Supply Requirements

Details the minimum power requirements and cable specifications for the lift.

Steps of Installation

Location of Installation

Ensuring the installation site is suitable for the lift, considering concrete, layout, and space.

Establish Installation Layout

Using a chalk line to mark the base-plate layout for accurate installation.

Check Parts Before Assembly

Procedure for verifying all components and parts against the shipment list.

Install Extension Column Parts

Guidance on installing components onto the extension columns as per the diagram.

Position Powerside Column

Instructions for positioning the powerside column based on ceiling height and connection points.

Position and Anchor Columns

Placing columns, installing anchor bolts, checking plumbness, and adjusting with shims.

Install Overhead Top Beam

Securing the overhead top beam to the extension columns using bolts and connecting brackets.

Install Limit Switch and Control Bar

Connecting the limit switch control bar and limit switch to the lift's electrical system.

Install Safety Devices

Procedure for installing the powerside and offside safety devices on the lift.

Lift and Lock Carriages

Manually lifting the carriages to approximately one meter and ensuring they are locked at the same level.

Install Cables (Low Setting)

Connecting the control cables for the low setting configuration of the lift.

Install Cables (High Setting)

Connecting the control cables for the high setting configuration of the lift.

Install Hydraulic Power Unit and Hoses

Mounting the hydraulic power unit and connecting the oil hoses to the lift cylinders.

Install Safety Cable

Routing and securing the safety cable as shown in the provided diagrams.

Install Oil Hose and Protective Covers

Installing oil hoses and protective covers on the extension and inner columns.

Install Lifting Arms and Adjust Arm Locks

Mounting the lifting arms and properly adjusting the arm lock mechanism.

Install Electrical System (Single Phase)

Connecting the power source, motor wires, and limit switch for single-phase operation.

Install Electrical System (Three Phase)

Wiring diagram and connection steps for three-phase motor electrical system installation.

Exploded View

Model SL-9 Parts Diagram

Visual representation of the SL-9 model with all parts identified for assembly.

Test Run Procedures

Adjust Synchronous Cable

Ensuring proper tension for synchronized operation of the lift carriages.

Adjust Safety Cable

Straining and tightening the safety cable to ensure functionality.

Bleeding Air from Hydraulic System

Removing air from the hydraulic system for stable and smooth lift operation.

Adjust Lower Speed

Modifying the throttle valve to control the descent speed of the lift.

Test with Load

Running the lift with load to verify synchronous operation and safety device function.

Operation Instructions

Lifting Vehicle

Step-by-step guide on safely positioning and lifting a vehicle using the lift.

Lowering Vehicle

Procedure for safely lowering a vehicle and preparing it for removal from the lift.

Maintenance Schedule

Monthly Maintenance Checks

Routine monthly tasks to ensure the lift's safe and efficient operation.

Six-Month Maintenance Checks

Periodic checks performed every six months for wear, damage, and proper function.

Troubleshooting Guide

Motor Does Not Run

Diagnosing and resolving issues where the motor fails to operate.

Motor Runs But Lift Not Raised

Troubleshooting causes for the motor running but the lift remaining stationary.

Lift Does Not Stay Up

Addressing problems where the lift fails to maintain its raised position.

Lift Raises Slowly

Identifying reasons for slow lift operation and potential solutions.

Lift Cannot Lower

Resolving issues that prevent the lift from lowering.

Parts List (SL-9;SL-9 H)

General Parts List

Comprehensive list of parts with item numbers, part numbers, descriptions, and quantities.

Parts for Oil Hose, Fitting & Cable

Specific parts related to the oil hose, fittings, and cables for the lift.

Parts for Hydraulic Cylinder

List of components specifically for the hydraulic cylinder assembly.

Parts for Manual Power Unit (220 V;50 Hz;1 phase)

Components for the 220V/50Hz single-phase manual power unit.

Parts for Manual Power Unit (380 V;50 Hz;3 phase)

Components for the 380V/50Hz three-phase manual power unit.

TECHNOLIFT SL-9 Specifications

General IconGeneral
BrandTECHNOLIFT
ModelSL-9
CategoryLifting Systems
LanguageEnglish

Related product manuals