EasyManua.ls Logo

TekPower TP40 - Continuity Check

TekPower TP40
47 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.2.4 Continuity Check
To avoid electrical shock and/or damage to the
instrument, disconnect circuit power and
discharge all high-voltage capacitors before
testing for Continuity.
To test for continuity (set up the Meter as shown in Figure
3-4):
1. Set the rotary switch to range.
2. Connect the black and red test leads to the COM and
terminals respectively.
3. Connect the test leads to the resistance in the circuit
being measured.
4. When the test lead to the circuit is below 50, a
continuous beeping will indicate it.
NOTE:
Continuity test is available to check open/short of the
circuit.

Related product manuals