EasyManua.ls Logo

Toshiba RAS-16PKVP-ND - Page 72

Toshiba RAS-16PKVP-ND
114 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
High Wall, Heat Pump Type
Service Manual
72
Toshiba
9-6-4. Removing the Vertical
Air Flow Louver
CAUTION
The horizontal air flow louvres cannot be released from
the vertical air flow louver.
1) Open the moving panel, and support it with the
panel support.
2) Open the vertical air flow louver.
3) Insert a flathead screwdriver into the gap of the
louver fixture on the right and left ends of the
vertical air flow louver, and turn in the counter-
clockwise direction to remove.
v
4) After pressing in the right and left connector
joints, remove the vertical air flow louvres.
Press in the right-side joint first before pressing
in the left-side joint.
9-6-5. Attaching the Vertical
Air Flow Louvres
1) Attach the vertical air flow louvres by inserting
the connector joints in the order of left, right,
and centre.
2) Secure the horizontal air flow louvres to the
connector joints.
3) After pressing in the connector joints, align the
positions of the connector joints and
connectors.
4) Press the louver fixture downwards to lock it
into place.
5) After attaching, move the louver fixture from
side to side to check that the connector joint
does not come off.
Louver fixture
Horizontal air flow
louvers
Air flow louver
Flathead screwdriver
Louver fixture
Horizontal air flow
louvers
Air flow louver
Flathead screwdrive
r
Removing the louver fixture
(Left side)
Removing the louver fixture
(Right side)
Louver fixture
Horizontal air flow
louvers
Connector joints
Connectors
Air flow louve
r
Louver fixture
Horizontal air flow
louvers
Connector joints
Connectors
Air flow louver
+00A08-010_01EN_SVM_HighWallHeatPump.book Page 72 Wednesday, March 4, 2009 11:22 AM

Table of Contents

Other manuals for Toshiba RAS-16PKVP-ND

Related product manuals