This document, including the information contained herein, is proprietary to Triotech Amusement Inc.
10.8 Replacing a Base Station
Remove the Base Station by removing the screw holding it in place.
1- When the new Base station is connected and secured the calibration will need to be
performed.
2- Settings
3- Configure Base Station Channels
4- The Base Stations need to be on different channels, but never channel 1 & 2. If you
own more than 1 Storm, make sure the Base Stations do not share a channel in-
between different machines.