EasyManua.ls Logo

Tuff Torq K92 - Page 17

Tuff Torq K92
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PTO Drive Train (Mid-PTO) Removal and Installation (continued)
8. Inspect ball bearings and needle bearing for
smooth rotation.
NOTE: Idler gear (N) and shaft (O) must be replaced
as a set. (Fig. 19)
9. Inspect gears and splines for missing or chipped teeth,
wear or damage. Replace parts if necessary.
A - PTO Clutch Assembly
B - Snap Ring
C - Needle Bearing
D - Washer
E - Seal
F - Needle Bearing
G - Washer
H - Cap Screw
I - Ball Bearing
J - Snap Ring
K - Mid-Mount PTO Gear
L - PTO Output Shaft
M - Snap Ring
N - PTO Idler Gear
O - PTO Idler Shaft
P - Washer
Fig. 19, Rear PTO Cover Removed
Fig. 20, PTO Drive Train (Mid-PTO) Disassembly
10