INSTALLER’S GUIDE
Page 47
2. If lying the burner on its
back, unscrew and remove
the two ceramic support
brackets from the top of the
burner unit. This will avoid
damage to the brackets and
the worksurface (see figure
57)
3. Disconnect the main
burner pipe from the
injector at the venturi end. If
necessary, loosen the pipe at
the flow rate controller end
to swing the pipe clear of
the injector.
4. Unscrew the injector
from the rear support bracket.
5. Refit in the reverse order.
Figure 64. Removal of ceramic support platform