EasyManuals Logo

Veratron VIEWLINE A2C59512390 User Manual

Veratron VIEWLINE A2C59512390
19 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #9 background imageLoading...
Page #9 background image
MECHANICAL INSTALLATION
9 B001686
INSTALLATION WITH BRACKETS
Conventional assembly. (Instrument is put into the drill hole from the front).
The panel width may be within a range of 2 to 13 mm.
The drill hole must have a diameter of 81 mm.
WARNING
Do not drill holes or ports in load-bearing or stabilizing stays or tie bars!
Note the necessary clearance behind the drill hole or port at the installation location. Required
mounting depth: 65 mm.
Drill small ports; enlarge and complete them, if necessary, using taper milling tools, saber saws,
keyhole saws or files. Deburr edges. Follow the safety instructions of the tool manufacturer.
1. Create a circular hole in the panel considering the
device dimensions.
2. Remove the spinlock and insert the device from
the front.
3. Screw the stud bolts into the provided drill holes
in the enclosure.
Max. stud bolt torque is 1.5 Nm.
4. Place the bracket on the stud bolt and hand-
tighten the knurled nut.
5. Make sure the seal lays flat between the panel
and the front ring.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Veratron VIEWLINE A2C59512390 and is the answer not in the manual?

Veratron VIEWLINE A2C59512390 Specifications

General IconGeneral
BrandVeratron
ModelVIEWLINE A2C59512390
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals