8.22 Maintenance table
Several times per day
Task Recommended interval Procedure / Parts Tool illustration
Checking the external compressed
air lines for damage
Before switching on the
machine
Visual check
Checking the suction hose for
damage
Before switching on the
machine
Visual check
Checking the cooling liquid If the flow rate is insufficient Visual check; exchange liquid
if necessary
Once per day
Task Recommended interval Procedure / Parts Tool illustration
Checking the compressed air regu-
lator
(page 66)
Before work
Clean or exchange cartridge
in case of visible contam-
ination or every 2 years
Daily cleaning of the working
chamber
(page 53)
After work
If soiled
Wet cloth
Exchanging the cooling liquid and
cleaning the tank
(page 33)
10 operating hours Brush, Water, Cooling liquid
Once per week
Task Recommended interval Procedure / Parts Tool illustration
Weekly cleaning of the working
chamber
(page 53)
Once per week
If soiled
Wet cloth, Dry cloth, Brush,
Collet chuck grease
Cleaning the multi-purpose
compartment
(page 57)
Once per week
If soiled
Wet cloth, Dry cloth
Cleaning the view window
(page 57)
Once per week
If soiled
Wet cloth, Dry cloth
Cleaning the collet chuck
(page 58)
Once per week
In case of rotational imper-
fections
Spindle service set
Cleaning the nozzle plate
(page 60)
Once per week
In case of irregular spray
patterns
Interdental brush
R5 – Maintenance and do-it-yourself
EN 71
Original Operating Instructions:R5
Version: 12/16/2021