Do you have a question about the Viessmann CIB and is the answer not in the manual?
Outlines the sequence of procedures for installation, checks, and upkeep.
Instructions on how to access and navigate the first level of system configuration codes.
Instructions on how to access and navigate the second level of system configuration codes.
Procedure for checking and controlling the output relays of the system.
How to view and understand error messages and fault indicators on the control unit.
A reference list of fault codes, their causes, and recommended measures for resolution.
Explains the operation of the control unit for weather-compensated heating systems.
Overview of various operational functions and their configurations.
Visual representation of electrical connections and component layout.
Wiring diagram for the main PCB specific to boilers up to 80 kW.
Wiring diagram for the main PCB for boilers between 120 and 160 kW.