Commissioning steps
Inspection steps
Maintenance steps Page
•
1. Filling the heating system and checking the supply of ventilation air......................... 11
• •
2. Checking the power supply
•
3. Changing the language (if required)................................................................................. 11
• •
4. Setting the time and date (if required).............................................................................. 12
•
5. Naming heating circuits..................................................................................................... 12
•
6. Checking the gas type....................................................................................................... 12
• • •
7. Removing the front panel.................................................................................................. 13
• • •
8. Function sequence and possible faults........................................................................... 13
• • •
9. Testing the static and supply pressure............................................................................ 14
•
10. Setting the maximum heating output............................................................................... 15
• •
11. Checking the combustion chamber pressure switch..................................................... 16
• •
12. Removing the burner and checking the burner gasket.................................................. 18
• •
13. Checking the burner gauze assembly and thermal insulation block............................ 21
• •
14. Checking and adjusting the ignition and ionisation electrodes.................................... 24
• •
15. Cleaning the combustion chamber and heating surfaces............................................. 24
• •
16. Cleaning the condensate drain system............................................................................ 25
• •
17. Cleaning the neutralising system (if installed)................................................................ 26
• •
18. Checking the condensate drain and neutralising system (if installed) for
obstructions and leaks...................................................................................................... 27
• •
19. Checking the gaskets and thermal insulation sections on the boiler side................... 27
• •
20. Checking the flue gas damper and flue gas header....................................................... 28
• •
21. Checking the expansion vessel and system pressure................................................... 29
• •
22. Checking the water quality................................................................................................ 29
• •
23. Checking the mixer for ease of operation and leaks...................................................... 29
• • •
24. Checking all connections on the heating water and DHW sides for leaks
• • •
25. Checking the safety valve function
• •
26. Installing the burner........................................................................................................... 29
• • •
27. Checking the firm seating of electrical connections
• • •
28. Checking all gas equipment for tightness at operating pressure................................. 29
• • •
29. Checking the combustion quality..................................................................................... 30
• •
30. Checking the ventilation air apertures in the installation room (only for open flue
operation)
•
31. Matching the control unit to the heating system............................................................ 31
•
32. Adjusting heating curves.................................................................................................. 31
•
33. Connecting the control unit to the LON........................................................................... 33
•
34. Calling up and resetting the "Service" display............................................................... 34
• • •
35. Mounting the front panel................................................................................................... 35
•
36. Instructing the system user.............................................................................................. 35
Commissioning, inspection, maintenance
Steps – commissioning, inspection and maintenance