10
Commissioning steps
Inspection steps
Maintenance steps Page
1. Filling the heating system and checking the supply of ventilation air......................... 11
2. Checking the power supply
3. Changing the language (if required)................................................................................. 11
4. Setting the time and date (if required).............................................................................. 12
5. Naming heating circuits..................................................................................................... 12
6. Checking the gas type....................................................................................................... 12
7. Removing the front panel.................................................................................................. 13
8. Function sequence and possible faults........................................................................... 13
9. Testing the static and supply pressure............................................................................ 14
10. Setting the maximum heating output............................................................................... 15
11. Checking the combustion chamber pressure switch..................................................... 16
12. Removing the burner and checking the burner gasket.................................................. 18
13. Checking the burner gauze assembly and thermal insulation block............................ 21
14. Checking and adjusting the ignition and ionisation electrodes.................................... 24
15. Cleaning the combustion chamber and heating surfaces............................................. 24
16. Cleaning the condensate drain system............................................................................ 25
17. Cleaning the neutralising system (if installed)................................................................ 26
18. Checking the condensate drain and neutralising system (if installed) for
obstructions and leaks...................................................................................................... 27
19. Checking the gaskets and thermal insulation sections on the boiler side................... 27
20. Checking the flue gas damper and flue gas header....................................................... 28
21. Checking the expansion vessel and system pressure................................................... 29
22. Checking the water quality................................................................................................ 29
23. Checking the mixer for ease of operation and leaks...................................................... 29
24. Checking all connections on the heating water and DHW sides for leaks
25. Checking the safety valve function
26. Installing the burner........................................................................................................... 29
27. Checking the firm seating of electrical connections
28. Checking all gas equipment for tightness at operating pressure................................. 29
29. Checking the combustion quality..................................................................................... 30
30. Checking the ventilation air apertures in the installation room (only for open flue
operation)
31. Matching the control unit to the heating system............................................................ 31
32. Adjusting heating curves.................................................................................................. 31
33. Connecting the control unit to the LON........................................................................... 33
34. Calling up and resetting the "Service" display............................................................... 34
35. Mounting the front panel................................................................................................... 35
36. Instructing the system user.............................................................................................. 35
Commissioning, inspection, maintenance
Steps – commissioning, inspection and maintenance
5839829

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Viessmann CIB and is the answer not in the manual?

Viessmann CIB Specifications

General IconGeneral
BrandViessmann
ModelCIB
CategoryBoiler
LanguageEnglish

Related product manuals