4.4 Assembling a mounting frame
(without oor)
NOTE
Damage due to improper mount-
ing!
f Before drilling, make sure that any
moisture barriers which may be laid
on-site in screed are not damaged.
f Make sure that no dowel holes
are under the cam locks of the ele-
ments.
f Make sure that the sealing lip is
correctlyseatedontheooron-site.
L
Thanks to their special design, the plastic U-proles
seal all the way down to the oor after assembly.
Â
ScrewU-prolestoooroftheinstallationspaceat
the intended position.
 Note the position of the door.
 PlacewallelementsintoU-proles.
 RivetorscrewwallelementswithU-proles.
 Make sure that the wall elements are perpendicular.
Door element without oor
L
Door element without oor is delivered with securing
for transportation and without door frame heating.
 Remove the door element’s securing for transport
before installation.
4.3 Level oor
4.3.1
Room with oor ventilation
L
Rooms with oor ventilation: Room temperature below
-5 °C.
 Iftheooronsiteisnotevenornothorizontal,level
the height of the bottom ventilation panel:
with adjustment plates
 Lay bottom ventilation panel loosely at distances of
200–300mm(clearspace).
 Begin levelling at the highest point.
 Make sure that the element joints (1)arecentred
during assembly and that the outsides of the ele-
ments (2)arelyingwiththeirfullsurfacesonthe
bottom ventilation panels.
4.3.2 Room without oor ventilation
 Iftheooron-siteisunevenornothorizontal,adjust
its height with adjustment plates.