EasyManuals Logo

Vision MAX Pro User Manual

Vision MAX Pro
183 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #173 background imageLoading...
Page #173 background image
Maintenance 173
© 2015 Vision Engraving Systems
Draining and Refilling the Water Feed System
The water in this system should be drained and refilled approximately every 6 months. To drain the
system, place a bucket under the water level indicator and rotate the indicator counter-clockwise. The
fitting should rotate fairly easily. Do not force the fitting to rotate, although using an open end wrench
and light pressure may be necessary. Allow the system to drain, then rotate the indicator back to vertical
and refill the system with clean water until the water level is at the mid-point of the indicator tube.
Fill the system by rotating the reservoir cover as shown and pouring water in until the proper water level
is reached.

Other manuals for Vision MAX Pro

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Vision MAX Pro and is the answer not in the manual?

Vision MAX Pro Specifications

General IconGeneral
BrandVision
ModelMAX Pro
CategoryEngraver
LanguageEnglish

Related product manuals