EasyManua.ls Logo

Wacker Neuson BTS 630 - Page 60

Wacker Neuson BTS 630
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10 Maintenance BTS 630, 635
60 Operator's manual
Replacing the V-belt
1. Remove the cutting attachment.
2. Remove the V-belt.
3. Place the new V-belt in position.
4. Place the cutting attachment in position and thread the V-belt in.
Item Designation
1 Cutting attachment
2 V-belt

Related product manuals