EasyManua.ls Logo

Wacker Neuson E 2200 - Page 103

Wacker Neuson E 2200
132 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
E 2200, E 3000ES Maintenance
wc_tx001670gb.fm 103
8. Remove the exhaust stack (e) (both inner and outer panels).
9. Vacuum out the exhaust ducting (f) and the heater.
10.Reinstall the exhaust stack.
11.Reassemble the machine.
Result
The procedure is now complete.
f
e
wc_gr008079

Table of Contents

Related product manuals