EasyManuals Logo

Wacker Neuson E 2200 User Manual

Wacker Neuson E 2200
132 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #97 background imageLoading...
Page #97 background image
E 2200, E 3000ES Maintenance
wc_tx001670gb.fm 97
Continued from the previous page.
Fill the HTF
reservoir
5. Move and hold the bypass switch (x) in the ON position. HTF will begin to flow.
When the HTF is level is between the minimum and maximum marks on the
sightglass (c):
a.Pull the fill hose from the HTF supply.
b.Release the bypass switch.
NOTICE: Do not overfill the HTF reservoir. Doing so may damage the machine.
Prepare
machine for
operation
After filling the HTF reservoir, perform the procedure below to prepare the machine
for operation.
1. Press the low-level shut-down reset button (a) if the red LED (b) is lit.
2. Move the operation valve (2) to the OPEN position.
3. Move the fill valve (3) to the CLOSED position and insert the pin.
4. Clean the fill hose, and cap the fill hose if a cap is provided.
5. Return the fill hose to its storage location under the hose reel.
Result
The machine is now ready for operation.
wc_
g
r008068
x
MAX
MIN
wc
_g
r008120
wc_gr007810
2
3
2
3
wc_gr008077
a
b

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson E 2200 and is the answer not in the manual?

Wacker Neuson E 2200 Specifications

General IconGeneral
BrandWacker Neuson
ModelE 2200
CategoryHeater
LanguageEnglish

Related product manuals