Operation LTN 6L-V
4.10 Operating the Lights
Requirements
All items in “Before Starting” checklist have been checked
Tower is raised to the desired height
Engine is running and has warmed up
Procedure
Perform the procedure below to operate the lights.
1. Turn on the main circuit breaker (a).
2. Turn on individual circuit breakers (b) one at a time.
Notes
Metal halide floodlights require a warm-up time of 5–15 minutes before they
reach full brightness.
After turning the lights off, a cool-down time of 10 minutes is necessary before
they can be turned on again.