Operating manual Piston Pump EvoMotion 5-125
7 Operation
Order number 2316596 | Edition 03/2021 37
6. Repeat steps under
Flushing return valve
and
Flushing via valve
as needed.
External Cleaning
1. Clean the outside of the system.
2. Fully assemble the system.
3. Relieve the pump's pressure according to Chapter Pressure Relief / Work Interruption
[834].
4. Dispose of the contents of the tank (5) according to the local regulations.
7.6 FILLING WITH WORKING PRODUCT
After basic flushing, the pump can be filled with working material.
4 Proceed according to Chapter Filling the Empty Pump [843], but use working
product instead of flushing agent.

Other manuals for WAGNER EvoMotion 5-125

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the WAGNER EvoMotion 5-125 and is the answer not in the manual?

WAGNER EvoMotion 5-125 Specifications

General IconGeneral
BrandWAGNER
ModelEvoMotion 5-125
CategoryWater Pump
LanguageEnglish

Related product manuals