EasyManua.ls Logo

Wang 5536 - Chapter 4 Installation; Incoming Inspection; Unpacking; Workstation Inspection

Default Icon
112 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER
4
INSTALLATION
3402
This
section
contains
the
information
necessary
to
unpack
and
install
the
5536
workstation.
4.1
INCOMING
INSPECTION
When
the
equipment
arrives,
immediately
locate
the
packing
slip
and
note
the
work
order
number.
Verify
the
equipment
model and
serial
number
as
listed
on
the
packing
slip.
Before
opening
the
container,
inspect
it
carefully
for
signs
of
damage
(crushed
edges,
puncture
holes,
tears,
etc.).
Should
damage
be
noted,
promptly
file
a
claim
with
the
carrier
and
notify
the
factory:
WLI
DISTRIBUTION
CENTER
Department
4f90
Quality
Assurance
Department
Tewksbury,
MA
01876
State
the
nature
and
extent
of
damage and make
arrangements
for
replacement
equipment,
if
necessary.
Be
certain
to
include
this
information:
WORK
ORDER
ff
CUSTOMER
NAME
CUSTOMER
#
MODEL
#
SERIAL
#
4.
2
UNPACKING
5536
workstations
are
packaged
in
a
single
cardboard
packaging
material
for
protection
during
shipping.
other
components
are
installed
at
the
factory.
4.3
WORKSTATION
INSPECTION
Remove
the
workstation
cover
as
follows:
container
with
special
Circuit
boards
and
o
Remove
the
three
phillips
screws
located
under
the
plastic
strip
on
the
keyboard
and remove
the
keyboard
plate.
o Remove one
phillips
screw
from
each
side
of
the
workstation
near
the
lower
edge
of
the
cover.
o
Lift
the
cover
up
and
away from
the
workstation;
take
care
not
to
hit
or
nick
the
CRT,
or
strain
the
brightness/contrast
wires.
o
Remove
the
brightness/contrast
wires
from
the
clamp
on
the
side
of
the
cover.
Lay
the
cover
on
its
side
next
to
the
workstation.
4-1

Related product manuals