EasyManua.ls Logo

WarmFlow COMBI 70 - Electrical Connections; Electrode Setting; Burner Start-Up Cycle

Default Icon
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Attention
Before assembling or removing the nozzle,
loosen the screw (A) and move the electrodes
away from the nozzle.
9.3 Electrical Connections
The boiler control equipment and the burner are provided ex works, it is only necessary
to connect a 230V 50Hz supply in accordance with the electrical drawings.
9.4 Electrode Setting
9.5 Burner Start-up Cycle
~ 12s
Thermostat
Motor
Ignition transformer
Valve
Flame
Lock-out lamp
~ 12s
Normal Lock-out due to failure to light
~ 5s
Page 37

Related product manuals