EasyManuals Logo

Wega Atlas 2010 User Manual

Wega Atlas 2010
Go to English
216 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #48 background imageLoading...
Page #48 background image
USER manual
48 of 216
NERO
C:0 M:0 Y:0 K:100
ROSSO
C:0 M:100 Y:100 K:0
VERDE
C:100 M:0 Y:100 K:0
6.4 Renewing the water
During the installation of the machine, the Qualied
Technician must replace the water contained in the hy-
draulic circuits by following these steps:
• when installation is complete, the appliance has to
be started, brought to the nominal working condi-
tion and left for 30 minutes in the "ready to operate"
condition;
• afterwards, the appliance has to be turned o and
emptied of the rst water introduced in the whole hy-
draulic circuit, to eliminate possible initial impurities;
• following this, the equipment must be charged again
and taken to its nominal operating conditions;
• After having reached the “ready for operation” status,
the following dispensing actions must be carried out:
- for each coee unit, carry out a continuous deliv-
ery, in order to release at least 0.5 litres from the
coee circuit. In the case of several dispensing
points matched with the same exchanger/coee
boiler, divide the volume on the base of the num-
ber of the dispensing points;
- discharge the whole volume of hot water from
the boiler (3 litres for 1GR, 6 litres for 2GR, 8 litres
for 3GR, 11 litres for 4GR) continuously dispensing
from the specic spout. In case of multiple dis-
pensing points, subdivide this volume according
to the number of dispensing points;
- continuously release steam for at least 1 minute
for each steam dispensing point.
If the machine remains inactive for a time longer than 1 week, the
Qualied Technician must renew 100% of the water contained in
the hydraulic circuit, as indicated above.
6.5 Preparing the machine
6.5.1 Coee grinding and dosing
It is important to have a dosing-grinding device next
to the machine with which to grind the coee to use
daily.
The grinding and the dosing of the coee must be
done according to that indicated by the manufacturer
of the dosing-grinding device. The following points are
also to be kept in mind:
• to obtain a good espresso it is recommended not to
keep large stocks of coee grains. Observe the expiry
date indicated by the producer;
• never grind large volumes of coee, it is advisable to
have the quantity contained in the dosing device and
to use it if possible by the end of the day;
• If possible, never purchase already ground coee,
as it deteriorates quickly. If necessary, buy it in small
vacuum-sealed packages.
6.5.2 Preparing the lter holder
• Fill the lter with a dose of ground coee (circa 6-7
gr.) and press it with the press;
• hook the lter-holder to the unit without closing it too
tightly in order to avoid excessive wear of the gasket;
• for the same reason it is recommended to clean the
edge of the lter before attaching the lter holder to
the dispensing unit;
• follow the procedures specied by the manufacturer
of the grinder.
6.5.3 Switching on of the work top light (if tted)
To switch on the light of the machine enclosure, press
the switch located under the controls front panel.
To switch the light o, select the same switch again.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wega Atlas 2010 and is the answer not in the manual?

Wega Atlas 2010 Specifications

General IconGeneral
BrandWega
ModelAtlas 2010
CategoryCoffee Maker
LanguageEnglish

Related product manuals