24
ENGLISH
7 Assembly - Initial Commissioning
7.1 Safety
To ensure the safety of the operator and others,
the design of the machine includes
minimal-risk assembly / handling.
The machine is subject to all applicable DIN
EN standards. Operator training and instructions are
required to further reduce the risk to the safety of the
operator.
7.2 Assembly
The complete assembly and initial commissioning is carried out exclu-
sively by the manufacturer. The machines are subjected to an extensive
test run and are only delivered after successful acceptance.
7.3 Initial commissioning
Beforeusingthemachineforthersttime,checkthe
entire machine for possible damage.
NOTICE
NOTICE