EasyManua.ls Logo

Wolf CGB-2 - Burner Inspection and Servicing

Wolf CGB-2
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3064812_201804 15
11.Checkingtheburner
Position the installation key (accessory) and lift the
combustionchamberandswingitout.
The heating water does not need to be drained as the
work can be carried out at system pressure.
●Visualinspectionofgasketsofgassupply
Inspet and if required replace gaskets of gas supply to
mixing chamber. Grease gaskets.

Related product manuals