Commissioning steps Testvaluesorconrmation
13.) Required heating output set in contractor parameter H04? □
14.) Gas type set in contractor parameter H12?
1 = Natural gas = 28 kW □
2 = LPG = 28 kW □
3 = Natural gas = 35 kW □
4 = LPG = 35 kW □
15.) Check system conguration and change as necessary
Expert parameter H40
Check hot water conguration and change as necessary
Expert parameter H51
□
16.) Gas type and output entered on label? □
17.) Balanced ue system checked? □
18.) Flue gas emissions test (emissions test mode):
Gross ue gas temperature
Intake air temperature
Net ue gas temperature
Carbon dioxide content (CO
2
) or oxygen content (O
2
)
Carbon monoxide content (CO)
_____________ t
FL
[°C]
_____________ t
IA
[°C]
_____________ (t
FL
- t
A
) [°C]
_____________ %
_____________ ppm
19.) Casing tted? □
20.) Function test carried out? □
21.) System user trained, documentation handed over? □
22.) Commissioning conrmed? _____________ □
27. Commissioning report