Getting started
EN
19
NOW ROLL YOUR SLEEVES UP. WHEN IT’S DONE IT’S DONE!
Now that you have planned the installation in every detail, you are ready to take action. Before starting, you may want to use
your old mower for the last time to clean up your lawn and make the installation easier.
2. INSTALL THE CHARGING BASE
2.1 Position the charging base
Option A: Position the charging base at the corner of your lawn (See Fig. 21)
To enter the charging base, Landroid Vision needs at least 2 m straight path in front and 5-15 cm away from the boundary of
the lawn.
Option B: Position the charging base on one side of your lawn (See Fig. 22)
To enter the charging base, Landroid Vision needs at least 2 m straight path in front and 5-15 cm away from the boundary of
the lawn. It needs at least 1.5 m behind the charging base to make sure the grass can be cut.
5-15cm
>
2m
>
1.5m
50-60cm50-60cm
>
1.5m
>
1.5m
<
6m
1 1
2
2
3
32cm
32cm
32cm
>
1m
5-15cm
>
2m
22
Option C: Position the charging base in the corner outside the lawn (See Fig. 23)
Locate charging base on the extension line and 5-15 cm away from the edge. To enter the charging base, the charging station
should be placed near the edge of the lawn.
5-15cm
5-15cm
>
2m
>
2m
>
1.5m
50-60cm50-60cm
>
1.5m
>
1.5m
<
6m
1 1
2
2
3
32cm
32cm
32cm
>
1m
5-15cm
>
2m
21
5-15cm
>
2m
>
1.5m
50-60cm50-60cm
>
1.5m
>
1.5m
<
6m
1 1
2
2
3
32cm
32cm
32cm
>
1m
5-15cm
>
2m
23