EasyManuals Logo
Home>Xvent>Heater>WiIND Series

Xvent WiIND Series User Manual

Xvent WiIND Series
29 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #14 background imageLoading...
Page #14 background image
14
Verze 1
GBR
(
25
.
8
.202
0
D
-
502
-
01
71
- Installation on the wall using the wall
console and threaded rods M8-10. Consoles
and M8-10 threaded rods are not included in
the delivery. It is ensured by the user
according to local conditions.
3.5.4.1. Examples of Curtain Suspension – Horizontal Installation
3.5.5. Measurement of anchoring holes
- Measure the anchoring holes according to the selected curtain type and anchoring type (according to the
suspension layout) - see the main dimensions 2.2 - dimension D.
3.5.6. Installation of the auxiliary anchoring structure
- Install auxiliary anchoring structures, e.g.: wall consoles. Select suitable anchoring material and tools
according to the material and the type of the background. Anchoring material is not part of the delivery.
3.5.7. Installation – hanging the curtain into the working position
- Lift the partially unpacked curtain according to section 3.5.1. with the installation hinges, using a suitable
handling technique (e.g. a lift truck) to the prepared assembly point. Partial packaging (pallet, protective
polystyrene) is used to protect the product from damage by scratching.
THREADED RODS
DOOR OPENING
THREADED RODS
DOOR OPENING
AUXILIARY CONSOLE
- Installation on the ceiling using the M8-10
threaded rods. Threaded rods M8-10 are
not included in the delivery. It is ensured
by the user according to local conditions.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Xvent WiIND Series and is the answer not in the manual?

Xvent WiIND Series Specifications

General IconGeneral
BrandXvent
ModelWiIND Series
CategoryHeater
LanguageEnglish