EasyManua.ls Logo

Xylem SI Analytics Lab 855 - Commissioning; Scope of Delivery; Power Supply; Initial Commissioning

Xylem SI Analytics Lab 855
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning Lab 855
10 ba77143e02 12/2017
3 Commissioning
3.1 Scope of delivery
Lab 855 meter
4 batteries 1.5 V Mignon type AA
Power pack
Stand
Stand holder
Short instructions
Detailed operating manual (4 languages)
CD-ROM with detailed operating manual
3.2 Power supply
The Lab 855 is supplied with power in the following ways:
Mains operation with the supplied power pack.
Battery operation (4 x alkaline manganese batteries, type AA)
3.3 Initial commissioning
Perform the following activities:
Insert the supplied batteries
Connect the power pack (mains operation)
Mount the stand
Switch on the meter
(see section 4.2 S
WITCHING ON THE METER, page 15)
3.3.1 Inserting the batteries
You can operate the meter either with normal batteries or with
rechargeable batteries (Ni-MH).
In order to charge the batteries, an external charging device is
required.

Table of Contents

Related product manuals