EasyManua.ls Logo

Xylem SI Analytics Lab 855 - Connecting the Power Pack

Xylem SI Analytics Lab 855
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Lab 855 Commissioning
ba77143e02 12/2017 11
1. Open the battery compartment (2) on the underside of the meter.
2. Insert four batteries in the battery compartment.
3. Close the battery compartment tightly.
3.3.2 Connecting the power pack
1. Connect the plug of the power pack to the socket for the power pack on
the Lab 855.
2. Connect the original power pack to an easily accessible power outlet.
CAUTION
Make sure that the poles of the batteries are positioned
correctly.
The ± signs on the batteries must correspond to the ± signs in
the battery compartment.
When the batteries are nearly empty, the [LoBat] status indicator is
displayed.
2
CAUTION
The line voltage at the operating site must lie within the input
voltage range of the original power pack (see section 11 T
ECH-
NICAL DATA, page 40).
CAUTION
Use original power packs only (see section 11 T
ECHNICAL DATA,
page 40).

Table of Contents

Related product manuals