5 Installation Procedure
YASKAWA ELECTRIC TOBP C730600 75B YASKAWA AC Drive Option PG-B3 Installation Manual 29
Replace and secure the LED Status Ring board (F).
Use the open space provided inside the LED Status Ring board to route option
wiring when using connector CN5-B.
NOTICE: Do not pinch cables between the front cover or the LED Status Ring board and the drive. Failure
to comply could cause erroneous operation.
7.
Connect the PG encoder outputs to the option.
Use the open space provided inside the LED
Status Ring board to route option wiring.
F
TOBP_C730600_75B_1_0_E.book 29 ページ 2017年2月17日 金曜日 午後3時2分