EasyManua.ls Logo

YOKOGAWA SC202G (S) - Field Change Order

YOKOGAWA SC202G (S)
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IM 12D7B3-E-E
11-9. Field Change Order
11-9-1 Changes made by software release 1.1
PH201 communication added for Japanese market
11-9-2 Changes made by software release 1.2
E20 is cleared after the programmed data was recovered
11-9-3 Changes made by software release 2.1
Communication is default set to enabled / write enabled
11-9-4 Changes made by software release 2.2
Minimal celconstant changed from 0,008cm
-1
to 0,005cm
-1
11-9-5 Changes made by software release 2.3
Default Temperature Compensation Matrix loaded,
to prevent ‘impossible’ values after a loading all parameters from DCS
11-9-6 Changes made by software release 2.4
Create possibility to disable E5/E6 diagnostics by setting the E5/E6 limits to 0 (zero)
Burn down outputsignal changed to 3.9 mA when the HART communication is enabled.
When disabled it is 3.6 mA
Fixed rare HART communication failure
11-9-7 Changes made by software release 2.5
Implementation of Burn low in combination with HART changed.
Some minor improvements in HART communication.
11-8 Appendix

Table of Contents

Related product manuals