EasyManua.ls Logo

Zebra 110Xi4 - Page 72

Zebra 110Xi4
182 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operations
Load Ribbon
72
P1009874-001 Xi4 User Guide 3/12/09
9. Bring the ribbon leader over the upper ribbon roller (1) and then toward the ribbon take-up
spindle (
2).
10. Wind the ribbon leader and attached ribbon counterclockwise around the ribbon take-up
spindle.
11. Rotate the spindle counterclockwise several turns to wind the ribbon and remove any
slack.
21

Table of Contents

Related product manuals