EasyManua.ls Logo

Zero Zone HYBRID RHLC30 - Suction Line Quick-Connect Insulation

Zero Zone HYBRID RHLC30
69 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14 • Condensing Unit Connection
CONDENSING UNIT CONNECTION
Insulation on Suction Line Quick-Connect
A pre-cut piece of split piping insulation (supplied) will be required on each freezer suction line quick-connect
coupling. Cable ties will also be provided.
1. Wrap piping insulation around the suction line quick-connect coupling. Position the insulation so that it
completely covers the quick-connect. (Insulation should not be added to the liquid line.)
2. Remove lm from adhesive strip on the insulation and adhere to other end.
3. Use cable ties to secure the insulation in place.

Table of Contents