EasyManua.ls Logo

Zero Zone HYBRID RHLC30 - Maintenance of Zero Zone Display Cases; General Cleaning Procedures

Zero Zone HYBRID RHLC30
69 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
32 • Operation
OPERATION
INSTALLATION: Determine desired shelving location. Lift the front of the shelf at a slight angle,
keeping the shelf level left to right. Insert the shelf tabs into the slots in the shelf standards.
Lower the front of the shelf while moving the shelf tabs into the standards and until the shelf is
held securely by the standards.
REMOVAL: Tilt the front of the shelf up while lifting the entire shelf and pulling out until the shelf
tabs clear the shelf standards.
Solid Shelf Installation & Removal
Shelf Standards

Table of Contents