EasyManua.ls Logo

Zero Zone HYBRID RHLC30 - Condensate Removal System Maintenance; Preventative Maintenance for Condensing Units and Coils

Zero Zone HYBRID RHLC30
69 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation • 33
OPERATION
Wire Shelf Installation & Removal
INSTALLATION: Determine desired bracket and shelving location. With the rst bracket, lift the front of it up at a slight angle. Insert the shelf
bracket tabs into the slots in the shelf standard. Lower the front of the shelf bracket while moving the tabs into the standards and until the shelf
bracket is held securely by the standard.
Repeat the process for the opposite shelf bracket. Make sure the shelf brackets are level left to right.
Place the back of the shelf onto the back of the shelf brackets. Swing the front of the shelf down until securely held by both shelf brackets.
REMOVAL: Lift the front of the shelf, then lift the back of the shelf. Tilt the front of the shelf bracket up and pull the shelf bracket tabs clear of the
shelf standard. Repeat the process for the opposite shelf bracket.
Shelf Standards

Table of Contents