General Operation
4.19
9. Record this measurement, this will be measurement
M2.
10.Subtract the second measurement (M2) from the first
measurement (M1).
Example:
The total sag is 1.97 in (50 mm). Refer to the chart below
for the correct sag. If the sag is not correct, the spring pre-
load should be adjusted. See “
Spring Pre-load
Adjustment”, on page 4-20.
MEASUREMENT OPERATOR VALUE
M1 23.62 in (600 mm)
M2 - 21.65 in (550 mm)
Sag = 1.97 in (50 mm)
MODEL SAG
FX - Street Legal 2.3 in to 2.9 in (69-76 mm)
MX - Dirt 2.3 in to 2.9 in (69-76 mm)
XU - Street Legal 1.5 in to 1.9 in (38-49 mm)
Zero Owner's Manual (X, MX and XU).book Page 19 Monday, April 29, 2013 3:30 PM